In the construction of solar plants, photovoltaic self-consumption installations supply clean energy to the control room, CCTV, and offices during project execution, ensuring full availability of our critical systems even under the most adverse weather conditions.

In the El Burgo I project, which we are building in the province of Zaragoza, we have designed an installation that will allow us to do without generators during the construction phase, achieving significant cost savings.

This is a 27.36 kWp dual-pitch photovoltaic installation featuring:

  • JA SOLAR modules, mounted on Landblock supports by Landatu Solar
  • Victron Energy regulators and inverter
  • 80 kWh storage capacity from Greenheiss

The equipment was supplied by Saltoki, the containers were provided by 3D MODULAR and integrated by NTV Solutions, and the electrical installation and commissioning were carried out by ALBA Instalaciones y Servicios.